Bidi medical technology (Jiangsu) Co., Ltd.: phase I and phase II air conditioning and ventilation, piping, electrical equipment, secondary piping and wiring installation of production equipment
Secondary piping and conductor arrangement for the production equipment
Secondary piping and conductor arrangement for the production equipment installation
Mushroom cultivation factory environmental control system and pipeline, electrical equipment in the phase II, and production equipment
Gas station construction and Secondary piping&conductor arrangement construction for the ventilating facility, pipeline, electrical equipment in the phase II
piping and electrical equipment installation in the phase IV&V construction;The air conditioner, pipeline and electrical equipment installation in the super fine line factory;
Secondary piping and conductor arrangement for the electrical and production equipment in the phase I, phase II and water treatment building construction
Secondary piping and conductor arrangement construction for the ventilating facility,electrical equipment
Secondary piping and conductor arrangement for the electrical and production equipment in the phase III construction
Secondary piping and conductor arrangement for the production equipment in the phase I
Interior finish, air conditioner, pipeline and electrical equipment installation
Secondary piping, conductor arrangement installation for the air-conditioning, and production equipment
Secondary piping, conductor arrangement installation for the air-conditioning, pipeline, electrical and production equipment
Air conditioner, pipeline and electrical equipment installation
New construction project of electrical and air conditioning equipment installation.
Construction of electric equipment
Construction of related-projects of the new plant
Construction of electric, air conditioning, water supply and drainage equipment installation (Phase Ⅲ)
New construction project of water, air conditioning system installation (Phase Ⅲ)
Construction of electric, air conditioning ventilation, water supply and drainage equipment
Construction of electrical equipment
Electric, air conditioning, water supply and drainage
Construction of workshop’s Water & Electricity, HVAC, etc. equipment installation (Phase I)
Construction of workshop’s of Water & Electricity, HVAC, etc. equipment installation.
Pipeline and electrical equipment installation
Electrical equipment and alarming&monitoring equipment installation
Secondary conductor arrangement for the electrical and production equipment
Secondary piping for the electrical and production equipment
Air conditioner, pipeline, and electrical equipement installation in the phase I, phase II, phase III, phase IV mechanical and electrical construction and in the phase I, phase II automotive construct
Secondary piping and conductor arrangement for the electrical and production equipment
Secondary piping, conductor arrangement installation for the production equipment
Secondary piping and conductor arrangement for the pipeline, electrical and production equipment
Electrical equipment installation
Electrical and instrument installation
Secondary piping and conductor arrangement construction for the ventilating facility, pipeline, electrical equipment in the phase Ⅱ&Ⅲ
Secondary piping and conductor arrangement construction for the ventilating facility, pipeline, electrical equipment in the phase I, phase II, and production equipment