川崎精密机械•苏州二期:电气、空调换气、给排水、生产设备二次配管配线工事

 

川崎精密机械(苏州)有限公司二期:电气、空调换气、给排水、生产设备二次配管配线工事

 

Kawasaki Precision Machinery (Suzhou) Co., Ltd:Phase II: Phase II: electrical, air conditioning ventilation, water supply and drainage, production equipment secondary piping and wiring works

 

川崎精密机械(苏州)有限公司電気、空調換気、給排水工事

 

20200325161901 684

 

20200325161901 996

关注微信